Saltash, Cornwall. Royal Albert Bridge (MLN2 @ 250m 70ch - 251m 23ch). View during construction from the construction yard on the Devon side

Saltash, Cornwall. Royal Albert Bridge (MLN2 @ 250m 70ch - 251m 23ch). View during construction from the construction yard on the Devon side

The Cornwall span had been lifted into place in 1857, and this photo shows the Devon span that had been floated into position on 10 July 1858 and was in the process of being raised into position. It was in its final position by 28 December 1858